Buxton House

Buxton House

Fire Risk Assessment

An FRA is an inspection of the building to check that the fire safety arrangements in place meet the legal fire safety requirements.

They also identify what else we can do to prevent fire and keep residents safe in your homes.

Name of building

Buxton House

Address

Buxton Way

Huddersfield

HD1 2PJ

Contact Details

Contact us if you have any questions or concerns about fire safety in this building

Phone 01484 414886

Email Firesafety.Enquiries@knh.org.uk

In a fire emergency always dial 999

 

Fire Authority

West Yorkshire Fire and Rescue Service

Birkenshaw

West Yorkshire

BD11 2DY

Phone 01274 682311

Email:information@westyorksfire.gov.uk

 

What do I need to do if there is a fire in my building?

Evacuation policy

Stat Safe

Means of escape

 

Building construction and cladding

  • Purpose built block of flats with commercial units on the ground and first floor.
  • Bin chute is in place and can be used via one of the two stairwells
  • The property has level access at the entrance points
  • Residential flats with communal access and two separate stairwells.   
  • The building does not have cladding

 

Findings from your Fire Risk Assessment & actions we are taking to address these findings in your building

Fire doors

New fire doors will be installed in your building

Compartmentation

Work to ensure fires can be contained and cannot spread through areas will be undertaken

Inspections

We will inspect the building regularly to ensure fire safety measures remain adequate

Vents

We will install or upgrade vents which clear smoke from an area

Management

Work to ensure the management of fire safety measures in the property are in order

Service and maintenance of your building 

The information below outlines the inspections and checks we will undertake on your building and the frequency of them.

Fire Risk Assessment 

The annual Fire Risk Assessment will be carried out in November 2020

Lifts

If you have a lift in your building we will check it every six months.

Electrical test and installation

We will test communal electrical installations such as wiring, sockets and lights every five years. 

Communal gas boiler

If you have a communal gas boiler in your building which provides heating / hot water to all flats, we will inspect it every 12 months.

Dry riser

If you have a dry riser in your building, which is used by firefighters to distribute water to all levels, we will inspect it every six months.

Fire detection system

Fire detection systems can include fire alarms, sprinkler systems, heat detectors, smoke detectors and carbon monoxide detectors. We will check them every three months.

Emergency lighting

Emergency lighting (or escape lighting) lights up a safe exit route if the mains power fails. We will inspect the emergency lighting in your building every three months.

Automatic open vent (AOV)

AOV's are used to control the ventilation of smoke in a fire. We will inspect them every three months.

© 2020 All rights reserved. Kirklees Neighbourhood Housing, Perseverance House, St. Andrews Road, Huddersfield, HD1 6RZ.